High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng

Short Description:


Product Detail

Related Video

Feedback (2)

Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for Desulfurization From Natural Gas, Water Jacket Furnace, Fuel Gas Conditioning Skid, How about to start your good organization with our corporation? We are all set, properly trained and fulfilled with pride. Let’s start our new business enterprise with new wave.
High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng Detail:

Description

The integrated natural gas gathering skid is an integrated equipment in the single well gas production which combines chemicals filling system, the water jacket furnace, separator, natural gas metering device, the pigging serve device, orifice throttling device, transmitter, fuel gas pressure regulating, corrosion monitoring system and a complete set of valves, piping and instrument.

The integrated natural gas gathering skid can realize the functions of gas gathering from single well, gas-liquid separation, emergency venting, venting and blowdown, liquid separation, metering, transportation and pigging, so as to ensure that the separated natural gas does not contain free water and the flare combustion gas does not contain liquid, so as to reduce the environmental pollution.

Product features

The integrated natural gas gathering skid is designed to meet the requirements of safe production, convenient operation, maintenance and management, and to achieve neat installation. Easy to transport, lifting and meter reading.

The incoming gas from the wellhead is heated by the heating furnace, and then enters the separator after two-stage pressure regulation, so that the light hydrocarbon and natural gas from the wellhead are separated, and the natural gas and light hydrocarbon are measured respectively. Finally through the launcher to the exit valve group.

The gas coming from the gas field’s fuel gas pipe network provides fuel through the pressure-regulating metering water jacket heating furnace, and at the same time provides the power gas source of the pneumatic liquid level controller.

For the corrosion inhibitor injection part, the injection pump outlet pressure is up to 70MPa, divided into two ways, one way to the wellhead, the other way to the pipe behind the orifice throttle device.

Technical parameters

1 Medium Sour wellhead gas
2 Rated flow 30 X 104Sm3/d
3 Intake pressure 30 Mpa
4 Intake temperature 10~40℃
5 Over dimension 10 X 3.2 X 4.7 m
6 Material Q245R
0601 07

Product detail pictures:

High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng detail pictures

High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng detail pictures

High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng detail pictures


Related Product Guide:

Our development depends on the advanced equipment, excellent talents and continuously strengthened technology forces for High Quality China Dosing Device Suppliers - Water jacket heater skid – Rongteng, The product will supply to all over the world, such as: Palestine, Tanzania, France, We have to continue to uphold the "quality, comprehensive, efficient" business philosophy of "honest, responsible, innovative"spirit of service, abide by the contract and abide by reputation, first-class products and improve service welcome overseas customers patrons.
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Honorio from belarus - 2017.05.21 12:31
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Aaron from Ukraine - 2017.02.28 14:19