(1)Ya'an Zhonghong 10X 104 Nm3/d LNG liquefaction project



Construction site: Lushan County, Ya'an City, Sichuan Province,China.
The main technical parameters:
1. Processing capability
Input natural gas: 10X 10 4 Nm³/d
Liquefaction output: 9.53 X 10 4 Nm³/d
Vent sour gas: ~1635Nm³/d
2. LNG product specifications:
LNG output: 68t/d (161m³/d); equivalent to gas phase 9.53X 10 4 Nm³/d
Temperature: -161.4 ℃
Storage pressure: 15KPa
(2) 100×104 m3/d LNG receiving plant for Qasim port, Pakistan
This project is designed and manufactured according to American Standard. LNG treatment plant and LNG transport ship delivere LNG to LNG gasification floating ship (storage and regasification unit) near FOTCO Wharf.
A new gas unloading wharf and pipeline will be built to transport the regasified natural gas from the LNG gasification floating ship to the connection point of SSGC, which is convenient for delivery to users in the future.

Construction site: Pakistan's second largest seaport, Rath Qasim seaport. It is located in the lower reaches of the Fitigli River, a branch of the west side of the Indus River Delta in the south of the country. Its northwest is about 13 nautical miles away from Karachi. It is the second largest seaport in Pakistan. It mainly serves for Karachi steel mills and domestic import and export goods, so as to reduce the pressure on Karachi Port.
Treatment capacity: 50 ~ 750 MMSCFD.
Design pressure: 1450 PSIG
Operating pressure: 943 ~ 1305 PSIG
Design temperature: -30 ~ 50 °C
Operating temperature: 20 ~ 26°C


(3)50×104 m3/d LNG liquefaction plant in Datong city, Shanxi province
Shanxi Datong LNG project is one of the key projects of new energy in Shanxi Province and is a key project of gasification promotion in Shanxi Province. When the project is completed, the output will reach
As one of the peak reserve centers of Shanxi LNG, its output will reach 50x104 m3/d.
The project will build a 50×104 m3/d natural gas liquefaction project and supporting facilities and a 10000 m3 LNG full capacity tank. The main process units include feed gas pressurization, decarbonization unit, decarbonization unit, dehydration unit, mercury removal and weight removal, hydrocarbon unit, liquefaction unit, refrigerant storage, flash steam pressurization, LNG tank farm and loading facilities.




(4)Ganquan Fengyuan 10X 104 Nm3/d LNG liquefaction unit



Construction site: Ganquan, Yan'an City, Shanxi Province,China.
The main technical parameters:
1. Processing capability
Inlet natural gas: 10X 10 4 Nm³/d
Liquefaction production: 9.48 X 10 4 Nm³/d (in storage tank)
Vent sour gas: ~5273Nm³/d
2. LNG product specification:
LNG output: 68.52t/d (160.9m³/d) ; equivalent to gas phase 9.48X 10 4 Nm³/d
Temperature: -160.7 ℃
Storage pressure: 0.2MPa.g
(5)Tongguan 10X 104 Nm3/d LNG liquefaction unit
The main technical parameters:
1. Processing capability
Input natural gas: 10X 10 4 Nm³/d
Liquefaction production: 9.9X 10 4 Nm³/d (in storage tank)
Vent sour gas: ~850Nm³/d
2. LNG product specification:
LNG output: 74.5t/d (169.5m³/d) ; equivalent to gas phase 9.9X 10 4 Nm³/d
Temperature: -160.6 ℃
Storage pressure: 0.2MPa.g


(6)30×104 m3/d LNG liquefaction plant in Cangxi city

Invested by Cangxi Datong Natural Gas Investment Co., Ltd. With 170 million yuan, the project will construct 300×104 m3/d LNG liquefaction project and supporting facilities and a 5000 m3 LNG full capacity tank.
MRC refrigeration process is adopted, and the main process plants include raw material gas pressurization unit, decarburization unit and dehydration unit, mercury removal and heavy hydrocarbon removal unit, liquefaction unit, refrigerant storage, flash vapor pressurization,
LNG tank zone and loading facilities.
Capacity: 30×104 m3/d
Working pressure: 5.0 MPa (g)
Design pressure: 5.5 Mpa (g)
Storage tank: 5000m3 full capacity tank
Storage temperature: -162°C
Storage pressure: 15KPa

(7)20×104 m3/d LNG plant for Xinjiang Luhuan Energy Ltd, Xinjiang
The main process units include feed gas pressurization, decarbonization unit, dehydration unit, mercury and heavy hydrocarbon removal unit, liquefaction unit, refrigerant storage, flash steam pressurization, LNG tank area and loading facilities. The feed gas is pipeline gas of 200,000 m3 / day, and the storage tank is 2000 m3 single volume tank.

Main technical parameters:
1. Processing capacity
Feed natural gas: 22x104 Nm ³/ d
Liquefaction output: 20x104 Nm ³/ d
Vent acid gas: 1152 Nm ³/ d
Venting nitrogen: 14210 Nm ³/ d
2. LNG product specification:
LNG output: 150 t/d (340 Nm ³/ d)
Storage pressure: 0.2 Mpa.g